Feasibility Study

Thermal Spa Sinsheim

Thermal Spa Sinsheim

As a project-financing bank, Sparkasse Heilbronn commissioned PROFUND Consult in 2012 to update the 2011 feasibility study for the Badewelt in Sinsheim.

The Badewelt Sinsheim was opened in December 2012. The waterpark will be operated by the Wund group, which is also responsible for the operation of the Therme Erding, Therme Bad Wörishofen and the Badeparadies Schwarzwald.


Project location

Google Maps

By loading the map, you agree to Google's privacy policy.
Learn more

Load map